Subdivision of NAP 34 Plot in Maharashtra

How to Get Subdivision of NAP 34 Plot in Maharashtra (Mahanagar Palika & Nagar Palika)

How to Get Subdivision of NAP 34 Plot in Maharashtra (Mahanagar Palika & Nagar Palika)

If you're looking to subdivide your NAP 34 plot in Maharashtra, whether in a Mahanagar Palika or Nagar Palika area, here's a step-by-step guide on the process and required documentation.

Introduction to NAP 34 Plot Subdivision

In Maharashtra, the subdivision of plots under the NAP 34 scheme involves specific steps and documentation to ensure proper legal compliance and urban planning. The process is regulated by the local authorities like Mahanagar Palika (Municipal Corporation) and Nagar Palika (Municipality). To successfully subdivide your plot, certain key documents must be submitted along with your application.

Required Documents for Plot Subdivision

Before you proceed with the subdivision application, you must ensure that you have the following essential documents:

  • Sale Deed: A legal document proving the ownership of the plot.
  • 7/12 Extract: A document that provides details about the land's ownership, including any encumbrances or restrictions.
  • Layout Map: A map showing all the plots in the specific area.
  • Proposed Subdivision Drawing: A subdivision drawing prepared by a registered engineer, showing the layout of the newly subdivided plots.
  • NA Order: The No Objection Certificate (NA Order) from the concerned authorities indicating that the plot is approved for non-agricultural purposes.

Where and How to Submit Your Application

Your application for subdividing a NAP 34 plot can only be submitted by a registered engineer through the Maharashtra Government's online BPMS portal. This process is mandatory, and the payment for the application should also be made online through the same engineer’s login (paid by you). The steps are as follows:

  • Ensure that the registered engineer prepares all the required documents, including the Sale Deed, 7/12 extract, Layout Map, Proposed Subdivision Drawing, and NA Order.
  • The engineer will submit the application online through the BPMS (Building Permission Management System) portal, ensuring compliance with all local regulations.
  • The engineer must also make the payment online via the portal using their login credentials, ensuring the transaction is linked to the application.

It is important to note that only a registered engineer can submit the application and make the payment, as they are authorized to handle the legal and technical aspects of the subdivision process.

Step-by-Step Process of Plot Subdivision

The process to subdivide a NAP 34 plot involves several key steps. Here's a general outline:

  1. Ensure all required documents are gathered, including the Sale Deed, 7/12 extract, Layout Map, Proposed Subdivision Drawing, and NA Order.
  2. Contact a registered engineer who is familiar with the procedures in the local Mahanagar Palika or Nagar Palika.
  3. The engineer will prepare the subdivision drawing and fill out the application form.
  4. The engineer submits the application online through the BPMS portal and makes the necessary payment from their login.
  5. After submission, the local authority will review the application, conduct site inspections if necessary, and issue approval for the subdivision.

Watch the Guide Video

To help you understand the entire process more clearly, watch the video guide below:

For more information, feel free to contact us or leave a comment below.